Hello , my mistake was that i integrated the flataid files instead the followed real flatframes generated with APT . First APT in Flataid generates Flataidframes from t min to t Max . Than APT calculates the time that correspondent with in my situation with ADU 24500 . Than you Must answer yes to overwrite the flataid Plan. Than APT takes 10, or more flat frames with the time above named Flats.
Please bevor say yes, delete the flataid frames locate in the same dir . Than debayer the flatframes and after that integrate f.e. with Pixinsight . Than you can see of the frame has his Main values in the middle of the histogramm, f.e. With Histogramm Transformation in PI .
I tested with ADU 7500, 15000, 20000, 25000 and 30000.
Best regards
Rainer